Submittal set
One PDF you can hand to a GC, an architect or a fabricator: the elevation with every panel at its real position, a panel map with each tag's blank and grooves, the panel schedule, and a revision sheet. Every sheet carries a title block with the drawing number, revision and sheet count — because a submittal is filed by revision.
What's in the set
G-0cover, drawing list, material spec, approval block
E-1…elevations — panels to scale, tagged, overall dimensions
M-1…panel map — every tag with its blank, notches and grooves
S-1…panel schedule — face, return, blank, m², kg, finish, core
R-1revision history, and what moved if you load the last issue
See one first
A complete example, built from the sample schedule on this page — same drawings, same title block, nothing held back.
Open the sample submittal (PDF)Panels are checked against an overlap test and a position check before the PDF is written: two tags claiming the same wall space is the most expensive mistake in a submittal, so it is reported, not guessed at.